Sustainability & ESG
Turn scattered operational data into a traceable ESG disclosure
Reduce data chasing and spreadsheet consolidation, and make reported figures easier to check and reuse in questionnaires.
Gather ESG evidence once, and report figures you can check and reuse.
One story, four steps
The ESG team prepares an annual electricity and emissions disclosure for three sites.
With KVARK AI Services
Step 1 of 4
Assemble the evidence
The analyst pins the reporting template and the approved methodology. A document-processing job extracts site, month, consumption and unit from utility bills and an uploaded meter spreadsheet, and the table highlights one missing December bill.
A job extracts consumption from utility bills and a meter sheet, and flags a missing December bill.
Example · Evidence table
35 of 36 months23 utility bills12 meter readings1 bill missing
With KVARK AI Services
Step 2 of 4
Resolve a data inconsistency
A validation skill flags 84,000 MWh where the bill states 84,000 kWh. The analyst opens the bill beside the table, confirms the correction and attaches the missing bill, and a colleague reviews the corrected evidence in the same workspace.
A validation skill catches MWh recorded for kWh; the analyst corrects it against the bill.
Example · Unit check
36 of 36 months24 utility bills12 meter readings
ChecksResolved
Kragujevac plant · March
- Recorded
- 84,000 MWh
- Bill
- 84,000 kWh
Corrected to kWh, as on the bill
Niš warehouse · December
Niš December bill.pdf
Bill attached · 29,600 kWh
Kragujevac March bill.pdfp. 1
Ravnica Energy
Electricity bill, March 2026
- Site
- Kragujevac plant
- Billing period
- 1 to 31 March 2026
- Meter
- KG-0447
- Active energy
- 84,000 kWh
JKJelena Kovačević reviewed the corrected evidence10:58
Built with KVARK AI Development
Step 3 of 4
Calculate and sign off
An ESG Data Review screen applies the approved, versioned conversion factors to the accepted data, with totals by site, factor references and open checks. Site owners confirm their figures, and the ESG lead approves the reporting dataset.
Approved factors turn the accepted data into totals; site owners confirm and the ESG lead approves.
Example · ESG Data Review
ESG Data Review
Reporting year 2026 · Electricity and emissions · 3 sites
- Calculated
- Confirmed
- Approved
Totals by siteAccepted data · 36 of 36 monthsNone open
SiteMWht CO₂eFactor
Kragujevac plant1,012.4455.6EF-GRID-2026 v2
Niš warehouse361.2162.5EF-GRID-2026 v2
Subotica office146.465.9EF-GRID-2026 v2
Total1,520.0684.0
EF-GRID-2026 v20.45 kg CO₂e per kWhApproved on 14 January 2027, replaces v1
ChecksNone open
- Kragujevac plant: March unit corrected from MWh to kWhConfirmed byDP
- Niš warehouse: December bill attached on 22 JanuaryConfirmed bySB
Sign-off3/3 site owners confirmed
Reporting dataset
2026, version 1
Reviewed by Jelena Kovačević
- LPLuka PavlovićSubotica officeConfirmed
- DPDragan PopovićKragujevac plantConfirmed
- SBSanja BabićNiš warehouseConfirmed
MRMilica RadićApproved the dataset at 16:20
Dataset lockedRDS-2026-0042
With KVARK AI Services
Step 4 of 4
Produce the disclosure pack
From the approved dataset, KVARK drafts the disclosure in Word and a management summary in PowerPoint. A reported total opens its evidence, and the same figures answer the electricity and emissions questions in a customer’s ESG questionnaire.
KVARK drafts the disclosure and summary, and reuses the same figures in a customer questionnaire.
Example · Disclosure pack
Electricity and emissions disclosure 2026.docx
ESG disclosure 2026
Electricity and emissions
Three sites · reporting year 2026 · location-based method
2. Electricity and Scope 2 emissions
In 2026 our location-based Scope 2 emissions were 684.0 t CO₂e, from 1,520.0 MWh of grid electricity used at our three sites, at the approved factor of 0.45 kg CO₂e per kWh.
SiteMWht CO₂e
Kragujevac plant1,012.4455.6
Niš warehouse361.2162.5
Subotica office146.465.9
Source: reporting dataset RDS-2026-0042, approved on 3 February 2027.
Evidence references
684.0 t CO₂eScope 2, location-based, 2026
- 1Reporting dataset RDS-2026-0042Approved by Milica Radić, 3 February 2027
- 2Factor EF-GRID-2026 v20.45 kg CO₂e per kWh × 1,520.0 MWh
- 324 utility bills, 12 meter readings3 sites, January to December 2026
Same figures in
Management summary.pptxSlide 2
Meridia Retail questionnaire.xlsx
- C4.1 Electricity used, MWh
- 1,520.0
- C6.2 Scope 2 emissions, t CO₂e
- 684.0
Page 2 of 4Saved
Start with one disclosure. Reuse its figures everywhere.
Start with assistants, skills and context boards in KVARK AI Services, and build dedicated screens, business rules and approval flows with KVARK AI Development where the process needs them.
Start with AI Services, and add dedicated screens as the process needs them.